| Model | SJ-4 |
| Product | Caster Jack |
| Hollow | ⌀ 34, 36, 38 & 48 MM |
| Solid | ⌀ 30, 32 & 34 MM |
| Lengths | 300 to 750 MM |
| Threading | 4 TPI (Round & Acme Thread) |
| Jack Nut | Casted or Forged Jack Nut or Casted Cup Nut |
| Finish | Self Finish, Electro Galvanized, Pre Galvanized, Hot Dip Galvanized & Dip Painted |
| Model | SP-3 |
| Product | Push Pull Prop |
| Outer Tube | ⌀ 60 MM with 38 MM Jack |
| Inner Tube | ⌀ 48 MM with 38 MM Jack |
| Pipe Wall Thickness | 3 MM |
| Lengths | 1.7 to 3.5 Metre |
| Finish | Electro Galvanized, Pre Galvanized, Hot Dip Galvanized, Dip Painted & Powder Coated Paint |
| Packing | Bundle or Iron Pallet Packing |
| Customization | Available |
| Model | SP-2 |
| Product | Inclined Prop |
| Outer Tube | ⌀ 60 MM |
| Inner Tube | ⌀ 48 MM |
| Pipe Wall Thickness | 1.4 to 4.0 MM |
| Lengths | 0.7 to 4.0 Metre |
| Finish | Electro Galvanized, Pre Galvanized, Hot Dip Galvanized, Dip Painted & Powder Coated Paint |
| Packing | Bundle or Iron Pallet Packing |
| Customization | Available |
| Model | SP-1 |
| Product | Shore Post (Adjustable Props) |
| Material | Mild Steel ERW Pipe, ISI Marked |
| Outer Tube | ⌀ 48, 56, 60, 76 & 89 MM |
| Inner Tube | ⌀ 40, 48, 62, 63 & 76 MM |
| Pipe Wall Thickness | 1.6 to 3.9 MM |
| Lengths | 1.5 to 6.0 Metre |
| Base Plate | 120 x 120 & 150 x 150 MM |
| Types of Plate | Flower, Square & U Type |
| Finish | Electro Galvanized, Pre Galvanized, Hot Dip Galvanized, Dip Painted & Powder Coated Paint |
| Availability | Also Available with Prop Cup Nut and Threaded Sleeve |
| Packing | Bundle or Iron Pallet Packing |
| Customization | Available |
| Model | SJ-3 |
| Hollow | 34, 36, 38 & 48 MM |
| Solid | 30, 32 & 34 MM |
| Lengths | 300 to 750 MM |
| Threading | 4 TPI (Round & Acme Thread) |
| Nut Type | Casted or Forged Jack Nut or Casted Cup Nut |
| Finish | Self Finish, Electro Galvanized, Pre Galvanized, Hot Dip Galvanized & Dip Painted |
Get to know more about our company, manufacturing capabilities and commitment to quality products and reliable service.
When we started back in 1985, the goal was simple: build rugged, dependable scaffolding hardware that construction crews could actually trust with their lives fifty feet in the air.